Blog

Cina: numerose richieste di Esperti per missioni

vsp onlus associazione volontariato volontari senior professionali missioni cina

Cina – Cercasi esperto: Aluminum surface treatment and other related Professional

TicketNr: 659
Description of the Requirements Developing the sealing additive without nickel on anodizing production line.
To meet the technical requirements of the sealing additive with nickel
Details on expertise Aluminum surface treatment and other related Professional;
Type of Client Large Business
Sector Production
Project Details Developing the sealing additive without nickel on anodizing production line.
To meet the technical requirements of the sealing additive with nickel.
Data of sealing additive:
1. Room temperature
2. Ashless
3. Non cohesive gel
4. Weight loss by phosphoric acid/chromic acid with nitric acid predip: ≤30mg/d㎡
Expected Project Start Date 08/03/2017
Duration (weeks) 1
Project Location Cina
Additional Information The requiring Company was established in 1984, which is the earliest professional enterprise engaging in the field of R&D and production of serial chemicals for aluminum surface treatment in China. Through more than 30 year’s construction and development, it has become a group, that has five subsidiary companies, and the products has also been developed from single one field of aluminum surface treatment to the fields of medicine and bio-engineering, etc.

The above reported project duration of 1 week refers only to the preliminary contact

Cercasi Esperto: Senior engineers or experts specializing in mechanics and materials-related subjects

TicketNr: 660 Full Name  
Description of the Requirements The core technology of the new product is diaphragm materials who are directly associated with its service life. For that reason, its materials should be strong enough to resist fatigue, crush, chemical solvent, and abrasion. 

The mission is to create quality products by following up the latest technology and developmental trend of diaphragm materials at home and abroad, and then applying them to the products.

 

E-mail
Details on expertise Senior engineers or experts specializing in mechanics and materials-related subjects Telephone
Type of Client Large Business Mobile
Sector Production Organisation Torino
Project Details 1) Diaphragm materials with high-grade formula;
2) Manufacturing process;
3) Matched structural design;
4) Technical requirements such as antifatigue, crush resistance, anti-chemical solvent corrosion, and abrasion resistance
Statistics & Data:Flow: 0.9 GPM (3.4 LPM);
Expected Project Start Date 08/03/2017
Duration 1
Project Location Cina
Additional Information The requiring Company is a private listed high-tech company located in Shenzhen, specializing in the R&D, production, sales, services of pumps and garden machines of all kinds. Now, it ranks first among domestic manufacturers and exporters in the present water pump industry with respect to its productivity scale, output, and export volumes.

Cercasi Esperto in: Wind power and electronical tecnical background first.

TicketNr: 661 Full Name  
Description of the Requirements The cooling system of Windmill generator.
Most 1.5MW and 2.0MW level Windmill generator use air-to-air cooler as its main cooling system. For controling operation and maintancee costs, the air-to-air cooler was also used to the level of 2.5MW.1-3 motors were equiped with one cooler to drive air. As one of the wearing part of the generator, Choosing the situable motor for generator is one of the most important works during the design precedure for incresing the service life and lowing loss damages.
E-mail vsp.torino@volontariato.torino.it
Details on expertise Wind power and electronical tecnical backgroud first Telephone
Type of Client Medium Business Mobile
Sector Production Organisation VSP Torino
Project Details Issues to solve:
1. What are the most important factors in designing the cooler system considering the wind power working conditions.
2. Choose the situable motors for the cooler.
3. Consider the right loading for motor.
4. For water cooled system, what is the most reasonable scheme.what aspect should engineers worked on in pre-design process.
5. Whether there is a new cooling system to make it smaller or not.
6. To avoid the damage caused by condention for electronical equipments in cooling system.
Expected Project Start Date 08/03/2017
Duration 1
Project Location Cina
Additional Information The above decleared project duration of 1 week refers to the first approach only.

The requesting Company has been founded in October 1995,registered capital is RMB60,430,000. At present the company covers an area of 47,900 square meters, at the same time ,another 8.6 acres are being constructed in coastal city. Finally, The company has 285 employees, including 12 senior engineers, 46 technicians and 94 employees that have a college education.

Salva

Salva

Salva

Salva

Salva

Salva

Leave a Comment

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

Related Posts